Āpōpō Infrastructure Asset Management ProfessionalsĀpōpō Infrastructure Asset Management Professionals
  • Home
  • About
  • Sign in
  • Home
  • About
  • Sign in
Home/Resource Kete/Traffic Monitoring Estimation Guidelines
  • Traffic Monitoring Estimation Guidelines
  • Executive Summary
  • Introduction
    • Importance
    • Context for Estimate Updates
    • Traffic Links
    • Desirable Qualities in an Estimation Process
    • Many Counts, One Annual Estimate
    • Rounding of Estimates
    • ONRC / ONF and Pavement Use Checks
    • Groups
  • Estimation Process
    • Individual Process Steps Summarised
  • Step 1: Update Database with the Latest Counts
  • Step 2: New Sections / Sections with No Estimate
  • Step 3: Establishing Road Types and Traffic Groups
    • Purpose of Grouping
    • Introduction to Road Types and Traffic Groups
    • Grouping for Road Type
    • Grouping for Traffic Groups
  • Step 4: Estimating Sections With Counts Since The Last Estimate
    • Method Options for Updating Links With a Valid Count
  • Step 5: Estimating Sections with Adjacent Counts
  • Step 6: Estimating Sections with No Recent or Adjacent Counts
  • Step 7: Traffic Mix
  • Step 8: Auditing
  • Step 9: Generating or Reviewing Links
  • Step 10: Count Strategy

ONRC / ONF and Pavement Use Checks

14 October 2022

The regular updating of estimates of traffic volume on the network can be used to check for any changes to network groups such as One Network Road Classification (ONRC) or One Network Framework (ONF) designations. These classifications have guidelines as to their application to give consistency nationally. The guidelines have several criteria aside from volume. So it is recommended that audit checks be set up to flag carriageway sections that are more than one band away from the AADT estimate.

In the RAMM database, there are pavement use categories set up based on fixed AADT volumes. These can be checked as part of the estimate audits (Step 8) and be triggered where the estimate does not match the pavement use band. There is a process in RAMM that can be run that will update pavement use based on the latest estimate.